Ideal for wells requiring little or no shut in time and wells that are flowing at or near critical rate producing high volumes of gas and fluid.
Utilizes standard lubricator/catcher assembly and standard downhole equipment. One piece design for simple operations. Able to control fall speed by adjusting flow ports.
Design allows for well to be produced continually with little or no shut in time. The design allows for the plunger to fall against flow in a continuous flow application or allows for minimal shut in time when required. Plunger is able to be cycled much more frequently than conventional plungers for wells producing high fluid volumes.
The Super Flow Plunger is another low-cost, efficient method of increasing and optimizing production in oil and gas wells that have marginal flow characteristics.
|